Builders & contractors

Your tender bill of quantities, ready while the bid window is still open.

You have to bid fast and cannot afford to forget anything. BauKIT builds a priced bill of quantities from the plan and flags additional costs that tend to get lost in a rush.

The challenge

What costs you time and certainty today.

  • Preparing the bill of quantities takes time you do not have in a tender race
  • Additional costs (sloping sites, existing buildings, logistics) get overlooked
  • Risk allowances are set as a flat rate instead of per project

With BauKIT

What changes.

Priced BoQ at the push of a button

A structured bill of quantities straight from the permit plan, as the basis for your bid.

Additional costs triggered by conditions

BauKIT recognises conditions that call for extra items, such as retaining walls on a sloping site or hazardous materials in an existing building.

Risk priced properly

The risk allowance follows the project type and the available data, justified and documented.

Most relevant

The features that matter for your work.

Precise quantity takeoff

Quantities are taken from the plan automatically. Every line item carries its derivation, so it can be checked and backed up.

Risk assessment

A risk allowance justified by the project and the available data, instead of a flat surcharge without context.

Quality check included

Before you use the result, BauKIT checks it for plausibility so that no line item is overlooked.

See BauKIT work on one of your own plans.

Book a no-obligation demo. We run BauKIT on one of your permit plans and discuss how it fits into your workflow.