AI construction estimating · built for Austria

A priced bill of quantities, read straight from your permit plan.

BauKIT is AI-assisted software for construction cost estimating and quantity takeoff in Austria. From a permit plan (PDF), BauKIT produces a structured quantity takeoff and a priced bill of quantities — checked against ÖNORM, OIB and BauKG, with a traceable source for every line item.

Input

Permit plan (PDF)

  • Floor plans
  • Sections
  • Elevations
  • Build-ups & dimension chains

+ Optional, for more precise results: Construction drawings (Polierpläne), Building and fit-out specification (BAB), Structural or preliminary structural calculations …

BauKIT analyses & estimates

Output

Quantity takeoff + priced BoQ

  • Structured quantity takeoff with derivations
  • Priced bill of quantities
  • Notes on likely additional costs
  • Justified risk allowance
instead of hours, days or weeks
Minutes

instead of hours, days or weeks

checked against Austrian standards
ÖNORM · OIB · BauKG

checked against Austrian standards

line items from LB-HB and LB-HT on file
21,000+

line items from LB-HB and LB-HT on file

traceable: every quantity has a source
100 %

traceable: every quantity has a source

The takeoff that used to take days now runs while you do something else.

The problem

Quantity takeoff takes days, and a forgotten line item comes out of your margin.

Measuring quantities from plans is tedious, error-prone and hard to trace. Additional costs get overlooked, risk allowances are set as flat rates, and in the end nobody can show how a figure was arrived at.

BauKIT reads the permit plan, calculates the quantities and produces a quantity takeoff with a derivation for every line item, checked against Austrian standards and with a justified risk allowance.

Quantities read from the plan

How it works

How a permit plan becomes a bill of quantities.

No weeks of measuring, no spreadsheet acrobatics. You upload the plan and get back a finished estimate.

  1. 01

    Upload the plan

    Upload your permit plan as a PDF. Floor plans, sections and elevations are enough. Add construction drawings, the building specification or structural calculations and the result gets more precise.

  2. 02

    BauKIT estimates

    BauKIT identifies the work the plan requires, calculates the quantities and checks the result against Austrian standards.

  3. 03

    Get the result

    You receive a structured quantity takeoff and a priced bill of quantities, with a traceable derivation for every line item.

BauKIT at work

Watch a permit plan become a bill of quantities.

A real example: upload a permit plan, have the screed areas calculated, receive a priced bill of quantities ready for export. The interface shown is in German.

Upload a plan and ask questions in plain language.
Quantities and a priced bill of quantities as the result.
Every quantity with calculation and source, checkable in Excel.

Features

Built for figures you can defend.

Automatic plan analysis

BauKIT recognises the work, materials and specifications contained in the permit plan, without manual measuring.

Precise quantity takeoff

Quantities are taken from the plan automatically. Every line item carries its derivation, so it can be checked and backed up.

Estimates that follow Austrian rules

Estimates follow ÖNORM, the OIB guidelines and BauKG, the Austrian construction worker protection act. Each result shows which rule it applied.

Risk assessment

A risk allowance justified by the project and the available data, instead of a flat surcharge without context.

Quality check included

Before you use the result, BauKIT checks it for plausibility so that no line item is overlooked.

Adapts to your instructions

Tell BauKIT about project-specific requirements. It adjusts the estimate and tells you when something is not possible for regulatory or logical reasons.

Export

Straight into your tendering software.

You take the result into your Austrian tendering (AVA) software without retyping anything: as an ONLV file according to ÖNORM A 2063, including quantities, line items and prices.

Compatible with

NevarisABKAuer Success
  • ONLV file (ÖNORM A 2063)
  • Quantity takeoff as Excel
  • Priced BoQ as Excel
  • Quotation as PDF
Export options in BauKIT: priced BoQ, quantity takeoff, ONLV (ABK/Nevaris) and quotation PDF

Your project, your rules

Tell BauKIT what matters on this project.

No project is standard. Give BauKIT project-specific information and requirements: what to consider where, which special conditions apply. BauKIT adjusts the estimate to your instructions.

If something is not possible for regulatory or logical reasons, BauKIT tells you, instead of quietly calculating it wrong.

Please account for the slope on the south side and list the carport separately.
Understood. I am adding the retaining wall for the slope and listing the carport as its own item. Note: the section does not show the ground level, so the exact retaining-wall quantity is still open.

Example instruction. BauKIT follows your requirements; the app itself works in German.

Who it is for

For everyone who turns plans into numbers.

Why you can rely on it

Nothing in the estimate goes unexplained.

Every quantity needs a source, and every assumption is disclosed. That turns an estimate into a calculation you can check and rely on.

Every quantity has a source

BauKIT outputs no quantity without evidence. Every line item points to its derivation.

No silent assumptions

When information is missing, BauKIT says so instead of guessing. You see exactly where the plan needs more detail.

A risk allowance with reasons

Instead of a flat surcharge you get a justified risk allowance that matches the data available for your project.

Sample project

Download a real result and check it yourself.

Download a complete sample project: permit plan, quantity takeoff, priced bill of quantities and the ONLV file for import into Austrian tendering software. The files themselves are in German.

FAQ

Frequently asked questions

What is BauKIT?

BauKIT is AI-assisted software for construction cost estimating and quantity takeoff in Austria. From an uploaded permit plan (PDF), BauKIT automatically produces a structured quantity takeoff and a priced bill of quantities, checked against ÖNORM, OIB and BauKG and exportable as Excel, a quotation PDF and an ONLV file according to ÖNORM A 2063.

Does BauKIT replace an estimator?

No. BauKIT replaces the takeoff and the preparation of the bill of quantities: the one to three days an estimator spends on a single-family house measuring quantities from the plan and assigning line items. The professional review stays with a person. Expect one to two hours to check the derivations and flagged assumptions. Our terms require results to be reviewed before they are used for a bid, an award or an invoice. That is intentional, not small print.

How accurate is the estimate?

Every quantity carries its calculation, its source in the plan (for example “basement plan sheet 1, build-up AW 2”) and one of three confidence classes: PLAN (stated directly in the plan), HERLEIT (derived from plan dimensions) or ANNAHME (an experience-based assumption because the plan lacks the information). For a residential complex with 215 line items, 69 were stated in the plan, 113 derived and 33 flagged as assumptions. You see not just a number but how certain it is. The strongest test is a blind test with a plan you have already estimated yourself.

How long does an estimate take, and what happens during that time?

A single-family house takes about 30 to 60 minutes; larger projects such as a residential complex with underground parking take two to three hours. During that time plan recognition, assignment of work items, quantity calculation, checks against the mandatory and standards rules on file, and pricing run fully automatically. Nobody at BauKIT steps in or reworks the result: upload, wait, result.

How does BauKIT handle missing or contradictory plan information?

Missing information is never silently guessed. Every affected line item is flagged as ANNAHME and its source column starts with “NICHT IM PLAN:” (not in the plan) plus a reason, for example “no structural calculation in the data set; reinforcement ratio of 130 kg/m³ as an experience value”. BauKIT also lists all open points together with their cost impact: missing soil report, missing demolition plan, missing window schedule. Contradictions between plan versions are reported as findings, not averaged.

See BauKIT work on one of your own plans.

Book a no-obligation demo. We run BauKIT on one of your permit plans and discuss how it fits into your workflow.