Sample project · new house with demolition, Lower Austria
253 m² gross floor area, one PDF. Scroll down and watch BauKIT turn it into a finished quotation.
The AI estimates
90 line items
across 18 trades
A quantity takeoff with a derivation for every figure, priced and including a justified risk allowance.
The result
Quotation total
€690,146
And the real value: the AI stopped the quotation because up to €230,000 of costs were missing.
The project
A new single-family house replacing an existing building, somewhere in Lower Austria. The permit plan arrived as a PDF. BauKIT produced the complete quantity takeoff from it, with a derivation for every figure, and built a priced bill of quantities.
Bill of quantities total €628,548 net, justified risk allowance of 9.8 % (€61,598), quotation total €690,146. Exported as Excel, quotation PDF and ONLV for Nevaris, ABK and Auer Success.
Checking, not just calculating
The existing building has to go, yet the plan contained not a single euro for it. Realistic range: €50,000 – 125,000.
Before demolishing an existing building, a survey according to ÖNORM B 3151 is required. It was not planned anywhere.
The amount set aside does not cover a project of this size, a classic item that eats into the margin later.
Two plan versions, two level specifications. Whoever notices only on site pays for the rework.
Traffic light: red, not ready to send
BauKIT stopped this quotation instead of making the numbers look good. Clarify first, then bid: that is the difference between checking and merely calculating.
Check it yourself
For download we provide a second real project: a residential complex with 8 flats, including permit plan, quantity takeoff, priced bill of quantities and ONLV file.
Book a no-obligation demo. We run BauKIT on one of your permit plans and discuss how it fits into your workflow.